Recovering a Lapsed Façade Access Programme on a Commercial Tower

About this example

A worked example rather than a named client. It describes how a lapsed façade access programme is recovered, drawn from over 26 years of lifting equipment engineering experience including BMU and cradle work.

Typical scope: four to eight cradle or BMU units on a single tower.

4–8
Units on a tower this size
6-monthly
Statutory cycle
Change of FM provider
Common trigger
The situation

Façade access equipment is the most reliably neglected lifting plant on a commercial building, for the simple reason that nobody sees it. It sits on the roof, it is used by a contractor rather than by the building's own staff, and responsibility for it falls between the managing agent, the FM provider and the window cleaning contractor. A change of FM provider is the classic trigger: the outgoing provider stops arranging examinations, the incoming one assumes it is in hand, and six or twelve months pass before anyone establishes that the units have lapsed — often when a cleaning contractor refuses to use them.

How the programme is run

Recovery starts with establishing what is actually up there and what paperwork exists for it, which on an inherited estate is frequently less than expected. Each unit is examined on a priority cycle, with the structure, the suspension ropes, the anchorages and the traversing arrangement treated as one system rather than as separate items. Where records are missing entirely, the examination establishes the present condition and the programme restarts from that date rather than from a date nobody can evidence.

What the duty-holder ends up with

What the building ends up with is every unit examined and back on a six-monthly cycle running from a date that can be evidenced, a clear record of which party arranges what, and reporting that reaches the managing agent rather than stopping with the cleaning contractor.

Why façade access lapses more often than anything else

Every other piece of lifting equipment in a commercial building has somebody who notices when it stops. A passenger lift generates complaints within the hour. A BMU can sit unused for months without anyone in the building being aware, and the people who do use it are a contractor on site a few times a year. Add a split between the managing agent who owns the asset, the FM provider who holds the contract and the cleaning contractor who operates it, and the result is a piece of equipment that carries people over the edge of a tower with nobody clearly accountable for its statutory examination.

The roof is the hard part, not the examination

Getting to façade access equipment safely is a job in itself. It means roof access permits, fall protection, often a confined or restricted working position, and weather that will cancel the visit at short notice regardless of what the diary says. A realistic programme builds in the possibility of a postponed visit rather than treating the date as fixed, because the alternative is an examiner working on a roof in conditions they should have walked away from.

What gets examined on a cradle system

The whole load path, from the building outwards: the anchorages and the structure carrying the unit, the davit or jib arrangement, the traversing gear and its track, the suspension and secondary ropes with particular attention to terminations, the hoists and the secondary safety device, and the cradle itself along with its controls and the means of raising an alarm from it. The secondary system matters disproportionately, because on façade access it is the thing standing between a primary failure and a fatality, and it is also the thing most easily assumed to be working because it has never been needed.

Restarting a cycle you cannot evidence

Where previous reports are missing, the honest position is that the equipment has no demonstrable examination history, and the programme restarts from the present examination rather than from an assumed earlier date. That is uncomfortable for a managing agent inheriting a building, but it is the only defensible answer: a cycle backdated to a report nobody can produce is worse than no cycle at all, because it looks like compliance while providing none.

The inspections behind this example

Trusted by Critical Estates

Independent. Defensible. Genuinely Endorsed.

SAFed-aligned defect classification, and the endorsement below is a genuine NHS Trust quote — not stock marketing copy.

NHS
NHS
Critical estate passenger lift compliance experience
SK
Skanska
Construction & engineering compliance support
A·B·C
SAFed-Aligned Defect Grading
Defects graded A, B or C to the published SAFed severity scale — a grading standard we follow, not a membership we hold
DBS
Enhanced DBS
Director Mark Crowley holds an enhanced DBS check
NHS Trust Endorsement
“Exceptional response times and thorough documentation. Managing compliance across multiple critical medical estates is complex, but their team makes statutory lift auditing seamless.”
Phillip Nai
Critical Healthcare Estates Manager
Barts Health NHS Trust

Request Your Inspection Survey

Tell us what needs inspecting and where — company name, contact details and a note on the equipment. We'll reply within one business hour.

Already have an asset list or examination schedule? Email it to info@integrityliftcompliance.co.uk and we'll come back with a survey plan rather than ask you to retype it.

Survey Request Form