Who Examines Hired or Leased Lifting Equipment?

The common assumption is that hired plant is the hire company's problem. It is partly theirs and partly yours, and the part that is yours is the part that gets missed. LOLER places duties on whoever has control of the equipment, which on a hire site includes you.

Written and reviewed by Mark Crowley, Director, Integrity Lift Compliance Ltd — 26+ years hands-on lifting equipment engineering — NHS, commercial and industrial estates

·

Who holds the duty on hired plant?

LOLER applies to employers and to anyone who has control of lifting equipment, to the extent of their control. A hire company controls the equipment's condition when it leaves the depot and its examination history. You control how it is used, assembled and maintained on your site. Both sit inside the regulations, and neither position cancels the other.

What should arrive with the machine?

A current Report of Thorough Examination. Check the date on it, not just its existence — a report for a MEWP is valid for six months because it lifts people, and hire fleets turn over quickly enough that a report can be close to expiry on arrival. If a machine arrives without one, it should not go into service.

Does the report cover the whole hire period?

Only if the hire ends before the report does. On a long hire the six or twelve months will run out mid-contract, and at that point the examination falls to whoever has control — frequently the hirer, unless the contract puts it elsewhere. Long-hire plant sitting on a site for a year is one of the most common ways a certificate quietly lapses.

What about equipment assembled on site?

Regulation 9(2) requires a thorough examination after installation and before first use where the safety of the equipment depends on the installation conditions, and again after assembly at each new site. A tower crane or a mast climber moved between sites needs examining at each one. That is a site duty, not a depot duty, and it is the one most often overlooked.

Can I use hired plant without seeing the report?

Regulation 9(4) says lifting equipment obtained from another business must not be used unless it is accompanied by physical evidence that its last thorough examination has been carried out. In practice that means the report, or something traceable to it. "The hire company said it was fine" is not physical evidence, and it is not a position you would want to defend after an incident.

What should a hire contract say?

It should say who examines the equipment during the hire, at what intervals, and who holds the reports. Contracts frequently say nothing, and silence defaults to whoever has control — which is you. Reading that clause before the plant arrives is considerably cheaper than discovering it afterwards.

Need a LOLER inspection?

Independent inspection, same-day report with photos

We reply within one business hour, and the inspection is carried out by an engineer with hands-on experience of that kind of plant.

Need this doing rather than just understood?

Independent statutory examination across London, Kent and the South East. We sell no maintenance, repairs or parts, so a defect we record is never a quotation in disguise.

Already overdue? Next working day for an overdue passenger lift in London, same week across Kent and the South East — and what to do in the meantime.